A Schedule of Condition is a factual record of the condition of a property at a particular date and is primarily used in connection with leases of commercial buildings.
The report is retained for use in the future, typically at lease end, to evidence the condition of the building at the start of the lease and assist in resolving disputes over tenant and landlord repair liability.
Schedules of Condition can be a list of photographs, a video or a combination of photographs and descriptive text.
Whilst this may appear to be a relatively simple task to complete and perhaps not a high priority at the start of a lease, the consequences of a poorly prepared report (or the lack of a report entirely) can be significant at lease end.
Disputes over repair works can involve costs of tens of thousands of pounds.


Leases that incorporate Schedules of Condition are intended to limit the tenant repair liability, ensuring that the tenant is not responsible for rectifying items of damage that existed at the start of the lease.
Alternatively, the tenant may only be responsible for maintaining the building to the standard that it was at when the lease commenced.
Without the Schedule of Condition to record the status of the property, it is often difficult for the tenant and the landlord to agree what the extent of repair should be at the lease end.
From our depth of experience and involvement in dilapidations claims, acting for both tenant and landlord, we know the high quality required in a Schedule of Condition for the report to truly serve it’s purpose.
Our inspections cover all parts of the leased building, providing a comprehensive collection of photographs and a very detailed description.
In leases where the tenant is responsible for the repair and maintenance of the exterior of the buildings, we recommend inspection of the roofs and inclusion in the schedule of condition.
We can complete high level inspections via drone cameras or access platforms to ensure all aspects of the building is documented.


A schedule of condition is often required at a stage where completion of the lease is critical and deadlines exist.
We provide a rapid response time for inspection of the property and complete our reports within days of inspection to prevent delays in occupation.
You can be assured that CH Building Consultants will provide a thorough, highly detailed schedule that can be relied upon to prevent ambiguity when it is most required.
Schedules of Condition FAQs
Here are some of the most common questions we hear from our clientele.
Schedules of Condition Case Studies
Explore our Schedules of Condition case studies, to see how we work.